DESIGN AND CONSTRUCTION SUPERVISION OF FOOTBRIDGE AT N.I.C. ON POKUASE-AWOSHIE HIGHWAY
PROJECT DURATION:
3 MONTHS
PROJECT SCOPE:
ARCHITECTURAL, CIVIL & STRUCTURAL DESIGN AND CONSTRUCTION SUPERVISION SUBCONTRACTOR TO CONSULTANT TRANSTECH LIMITED
PROJECT STATUS:
COMPLETED
PROJECT DETAILS
This project was subcontracted by Transtech Limited. It comprised architectural, civil and structural design, and construction supervision of footbridge at N.I.C. on the Pokuase-Awoshie Highway. The project was completed in 2016. It lasted 3 months.
Design and Construction of JAK Foundation Auditorium at UG, Legon
Design and Construction of AC Test Facility at GSA for MiDA
Design and Construction of Auditorium and Office Complex for GAMLS
Design and Construction of Church Auditorium for Methodist Church (Emmanuel Society), Lashibi
Construction of Foot Bridge on the Awoshie-Ablekuma Highway
Design and Construction of Road Gantry Signs
Previous slide
Next slide
GHS Engineering Limited
This is a sister company to GHS Housing Limited that handles design and construction of private and commercial buildings, civil works (roads, bridges, water supply systems, steel structures,), among others. Click below to check out their profile or close to continue.
This is a sister company to GHS Housing Limited that handles design and construction of private and commercial buildings, civil works (roads, bridges, water supply systems, steel structures,), among others. Click below to check out their profile or close to continue.